Our Work, Project by Project.

Download project references
Completed · 2021

Selac Wind Farm — Electrical & Grid Infrastructure

Transmission & Grid Connections · Wind energy · Selac / Bajgora, Kosovo

Completed

35 kV Underground Power Infrastructure & SCADA Integration

Distribution, MV & Substations · Hydropower · Kosovo

Completed

Peshkopi–Lapaj 110 kV Transmission Infrastructure

Transmission & Grid Connections · Peshkopi, Albania

Radoniqi–Dukagjini — Electrical & SCADA Systems

Industrial Electrical & SCADA · Water & irrigation · Gjakovë, Kosovo

Contract awarded · 2026

Kosova B1/B2 Modernization

Industrial Electrical & SCADA · Thermal power · Obiliq, Kosovo

Contract awarded · 2026

Underground Connection North Mitrovica – Trepça Mine

Distribution, MV & Substations · Mitrovicë, Kosovo

2015

HEC Albankiu III — Grid Connection

Distribution, MV & Substations · Hydropower · Trepça, Kosovo

2016

Rahovec Line Works

Transmission & Grid Connections · Rahovec, Kosovo

2018

HEC Binça — 10/20 kV Infrastructure

Distribution, MV & Substations · Hydropower · Binça, Kosovo

2022

AutoMita Çagllavicë — 100 kVA Transformer Station

Distribution, MV & Substations · Çagllavicë, Kosovo

2023

AutoMita Sevce — Transformer Station

Distribution, MV & Substations · Shtërpcë, Kosovo

KEDS — Meter Relocation

Distribution, MV & Substations · Utilities · Ferizaj, Gjilan & Gjakovë districts

ElektroStublla Headquarters

Lighting & Architecture · Viti, Kosovo

Mother Teresa Cathedral

Lighting & Architecture · Prishtina

Devolli Corporation

Lighting & Architecture · Peja

Lighting design simulation — not a photo of the finished installation.

St. Joseph Church

Lighting & Architecture · Stublla

St. Nikola Church

Lighting & Architecture · Kabash

Planeti Residence

Lighting & Architecture · Gjilan

Gadime Caves

Lighting & Architecture · Lipjan

Historic Bridges Exhibition

Lighting & Architecture · Prishtina