Selac Wind Farm — Electrical & Grid Infrastructure

110 kV
Transmission voltage
142 km
MV cable installed
27 × 3.8 MW
Turbines commissioned
105 MW
Overall wind farm

The Project

The 105 MW Selac wind-energy development in Bajgora required a 110 kV transmission connection, a medium-voltage cable network and communication systems to bring its turbines onto Kosovo's grid.

Category
Transmission & Grid Connections
Sector
Wind energy
Location
Selac / Bajgora, Kosovo
Status
Completed
Year
2021
Reference issued by
NOTUS Energy
Outcome
Completed; turbines energized and commissioned.

ElektroStublla's Role

ElektroStublla delivered the project's electrical and grid infrastructure across several work packages: the 110 kV overhead line, the medium-voltage cable network, fibre-optic and SCADA communication, and the electrical energization and commissioning of the turbines. The turbines themselves were supplied and erected by others.

  • Design and construction of the 110 kV overhead transmission line
  • OPGW fibre-optic cable on the transmission line
  • Installation of the medium-voltage cable network
  • Substation-related construction and electrical works
  • Fibre-optic testing and SCADA communication
  • Electrical energization and commissioning of the wind turbines