- 110 kV
- Transmission voltage
- 142 km
- MV cable installed
- 27 × 3.8 MW
- Turbines commissioned
- 105 MW
- Overall wind farm
The Project
The 105 MW Selac wind-energy development in Bajgora required a 110 kV transmission connection, a medium-voltage cable network and communication systems to bring its turbines onto Kosovo's grid.
- Category
- Transmission & Grid Connections
- Sector
- Wind energy
- Location
- Selac / Bajgora, Kosovo
- Status
- Completed
- Year
- 2021
- Reference issued by
- NOTUS Energy
- Outcome
- Completed; turbines energized and commissioned.
ElektroStublla's Role
ElektroStublla delivered the project's electrical and grid infrastructure across several work packages: the 110 kV overhead line, the medium-voltage cable network, fibre-optic and SCADA communication, and the electrical energization and commissioning of the turbines. The turbines themselves were supplied and erected by others.
- Design and construction of the 110 kV overhead transmission line
- OPGW fibre-optic cable on the transmission line
- Installation of the medium-voltage cable network
- Substation-related construction and electrical works
- Fibre-optic testing and SCADA communication
- Electrical energization and commissioning of the wind turbines