- 35 kV
- Voltage
- 8 km
- Underground route
- 24,750 m
- Total cable installed
- SCADA
- Control system
The Project
Electrical infrastructure for the grid integration and operation of hydropower generation capacity.
- Category
- Distribution, MV & Substations
- Sector
- Hydropower
- Location
- Kosovo
- Status
- Completed
- Client
- Hydro-Line L.L.C.
- Outcome
- Completed and commissioned, as confirmed by the client.
ElektroStublla's Role
ElektroStublla built the 35 kV underground line with its cable and fibre-optic ducting, installed and integrated the SCADA system, and carried out testing, commissioning and technical handover.
- 8 km underground 35 kV line
- Underground cable and fibre-optic ducting
- Cable joints and terminations
- Fibre-optic communication for SCADA
- SCADA installation and integration
- Testing, commissioning and technical handover