- 10/20 kV
- Voltage level
The Project
- Category
- Distribution, MV & Substations
- Sector
- Hydropower
- Location
- Binça, Kosovo
- Year
- 2018
ElektroStublla's Role
Medium-voltage 10/20 kV infrastructure for a hydropower plant.
Medium-voltage 10/20 kV infrastructure for a hydropower plant.